Projects

Lower Dunton Flexible Generation 11 kV Substation

Powersystems delivered the 11 kV grid connection and full Electrical Balance of Plant for the 7.5 MW Lower Dunton Flexible Generation site, including HV/LV installation, testing, protection and commissioning to support Conrad Energy’s growing distributed generation portfolio

Pen y Cymoedd 228 MW Wind Farm

Powersystems designed, installed, tested and commissioned the electrical infrastructure for the 228 MW Pen-Y-Cymoedd Wind Farm project.

Joseph Heler Cheese Factory – 1.0 MW CHP Electrical Infrastructure Project

Powersystems delivered the full 11 kV electrical infrastructure, HV cabling, protection systems and G99 commissioning for the 1 MW CHP generator at Joseph Heler Cheese Factory, providing efficient on site low carbon energy generation.

Mid Hill 75.9 MW Wind Farm

Powersystems designed, installed, tested and commissioned the electrical infrastructure for the 75.9 MW Mid Hill Wind Farm project.

Shetland battery energy storage scheme

To help smooth the electrical supply network on Shetland, a 6 MW BESS was cabled, installed and commissioned by Powersystems

Priors Hall,Primary Substation 33 kV project

Powersystems were appointed by Connect Utilities now GTC to design and build a new 24MVA 33/11 kV primary substation.

Sims Metal Substation, 132 kV project

The installation of a new scrap metal processing plant at the Sims Metal Newport site required a connection that would cope with the starting and stopping of a 6 MW 11 kV crusher motor.

Stangate Landfill, Kent

Powersystems overcame expensive project challenges and negotiated a connection to the 132 kV overhead line that passed within 300 m of the generation compound.

Brogborough Landfill Generation, 30 MW project

Powersystems were awarded the turnkey design and build contract for the new generation station for 30 No reciprocating gas engines with an export capacity of 30 MW.