Beavertown Brewery – HV/LV Infrastructure Upgrade

Powersystems delivered a new 2000 kVA HV/LV supply for Beavertown Brewery, including a high level LV cable system, 11 kV isolator, and full transformer integration. Completed in just six weeks, the upgrade increases power capacity to support Beavertown’s continued growth and ready to produce beer in March 2020.

Bryn Blaen 14.1 MW Wind Farm

Powersystems designed, installed, tested and commissioned the electrical infrastructure for the 14.1 MW Bryn Blaen Wind Farm project.

Principality Stadium DRUPS System

Powersystems engineers were involved with designing the earthing system, the HV circuits, the cable containment and some the LV cables for the DRUPS system.

Pen y Cymoedd 228 MW Wind Farm

Powersystems designed, installed, tested and commissioned the electrical infrastructure for the 228 MW Pen-Y-Cymoedd Wind Farm project.

Mid Hill 75.9 MW Wind Farm

Powersystems designed, installed, tested and commissioned the electrical infrastructure for the 75.9 MW Mid Hill Wind Farm project.

Shetland battery energy storage scheme

To help smooth the electrical supply network on Shetland, a 6 MW BESS was cabled, installed and commissioned by Powersystems

Priors Hall,Primary Substation 33 kV project

Powersystems were appointed by Connect Utilities now GTC to design and build a new 24MVA 33/11 kV primary substation.

Sims Metal Substation, 132 kV project

The installation of a new scrap metal processing plant at the Sims Metal Newport site required a connection that would cope with the starting and stopping of a 6 MW 11 kV crusher motor.

Stangate Landfill, Kent

Powersystems overcame expensive project challenges and negotiated a connection to the 132 kV overhead line that passed within 300 m of the generation compound.

Brogborough Landfill Generation, 30 MW project

Powersystems were awarded the turnkey design and build contract for the new generation station for 30 No reciprocating gas engines with an export capacity of 30 MW.