Powersystems designed, installed, tested and commissioned the electrical infrastructure and grid connection for Marlborough College.
Powersystems designed, installed, tested and commissioned the electrical infrastructure for the 20.5 MW Wandylaw Wind Farm project.
As a high voltage engineering contractor Powersystems were the preferred partner appointed for designing, procuring, installing and commissioning the HV electrical infrastructure for the new Battery Testing and Powertrain facilities at Millbrook Proving Ground.
Powersystems has delivered the practical works for the design, supply, installation, testing and commissioning for the electrical infrastructure at Hullavington Airfield for Dyson.
Powersystems were delighted to meet the critical milestones of this project enabling the client to increase the power supply to ultimately upscale the Beavertown brewery business. The work was completed on time and to budget ready for the first production of beer due for March 2020.
Powersystems designed, installed, tested and commissioned the electrical infrastructure for the 14 MW Bryn Blaen Wind Farm project.
Powersystems engineers were involved with designing the earthing system, the HV circuits, the cable containment and some the LV cables for the DRUPS system.
Powersystems designed, installed, tested and commissioned the electrical infrastructure for the 228 MW Pen-Y-Cymoedd Wind Farm project.
Powersystems designed, installed, tested and commissioned the electrical infrastructure for the 75.9 MW Mid Hill Wind Farm project.
To help smooth the electrical supply network on Shetland, a 6 MW BESS was cabled, installed and commissioned by Powersystems