Crystal Rig IV 49.1 MW Wind Farm — Electrical Balance of Plant (EBoP)

Powersystems delivered the full 132/33 kV electrical infrastructure for the 49.1 MW Crystal Rig IV Wind Farm, including a new grid transformer, 20 km of 33 kV cabling and full SCADA integration—supporting clean energy generation for more than 50,000 homes.

Limekiln 108 MW Wind Farm — Electrical Balance of Plant (EBoP)

Powersystems delivered the full 132/33 kV Electrical Balance of Plant for the 108 MW Limekiln Wind Farm, including a 120 MVA grid transformer, 25 km of 33 kV cabling, protection systems and SCADA integration. Working alongside Boralex and R.J. McLeod, the project enables clean, renewable electricity for around 100,000 homes and supports Scotland’s long term net zero goals.

Camster II 36 MW Wind Farm — Electrical Balance of Plant (EBoP)

Powersystems delivered the full Electrical Balance of Plant for the 36 MW Camster II Wind Farm, installing 4.8 km of 33 kV cabling, a new 33 kV substation, SCADA, protection and control systems. Despite a one year grid delay, the project was energised safely in December 2025 and will provide clean energy for around 40,000 homes.

North Kyle 212 MW Wind Farm — Electrical Balance of Plant (EBoP)

Powersystems delivered the full Electrical Balance of Plant for the 212 MW North Kyle Wind Farm, energising 49 Vestas V150 turbines and installing over 353 km of 33 kV cabling. The project transforms a former coal mining landscape into a major clean energy hub powering around 183,000 homes while supporting large scale ecological restoration and community benefit.

Airbus Fairlawn 11 kV Switchgear Replacement

Powersystems successfully delivered the full refurbishment of the critical Fairlawn 11 kV substation at Airbus Filton, replacing end‑of‑life infrastructure while maintaining uninterrupted power to one of the UK’s most important aerospace manufacturing sites. The £1.6 million project included a new 13‑panel HV switchboard, two 1000 kVA transformers, LV upgrades and full cabling replacement — all completed within a live operational environment and without any disruption to Airbus’ production activities.

Auchteraw 50 MW / 100 MWh BESS — Civil & Electrical Balance of Plant (EBoP)

Powersystems delivered the complete civil and electrical Balance of Plant for the 50 MW / 100 MWh Auchteraw BESS, installing 316 CATL battery cubes, PCS units, transformers and 33 kV infrastructure to enable full grid connected operation in the Scottish Highlands.

Glen Kyllachy 48.5 MW Wind Farm — Electrical Balance of Plant (EBoP)

Powersystems delivered the full electrical balance of plant for the 48.5 MW Glen Kyllachy Wind Farm, including a 132/33 kV substation, 40 km of 33 kV cabling, advanced protection systems, SCADA integration and grid connection. The project now supplies clean energy to around 100,000 homes, supporting Scotland’s transition to a low carbon future.

Sandy Knowe 86.4 MW Wind Farm — Electrical Balance of Plant (EBoP)

Powersystems delivered the full electrical balance of plant for the 86.4 MW Sandy Knowe Wind Farm, including a new 132 kV substation, 22.3 km of 33 kV cabling, protection and SCADA systems, grid transformer infrastructure, and turbine array integration. Now fully operational, the site provides clean power for over 55,000 homes and supports Scotland’s net zero ambitions.

Bustleholme 49.9 MW Battery Energy Storage System (BESS)

Powersystems delivered the complete Electrical Balance of Plant for the 49.9 MW Bustleholme BESS, including 76 battery cubes, 19 inverters, 33 kV switchgear and National Grid tertiary connection works, enabling full operation in autumn 2023.

Morlais Anglesey 240 MW Tidal Energy

Powersystems are proud to be part of Morlais Tidal Energy which is groundbreaking initiative and set to harness up to 240 MW of tidal energy in Walles.