Brecon Power STOR

Powersystems high voltage (HV) power engineering were responsible for the design, installation, testing and commissioning of the electrical infrastructure associated with the construction of the 21 MW embedded short term operating reserve (STOR).

The Cornwall Bakery (Ginsters) – 2.7 MW CHP Electrical Infrastructure Project

Powersystems delivered the full 11 kV grid connection and electrical infrastructure for the 2.7 MW CHP generator at The Cornwall Bakery (Ginsters), supporting on‑site low‑carbon energy generation, improved operational efficiency, and reduced long‑term energy costs for one of the UK’s leading food manufacturers.

Principality Stadium 4 MW DRUPS Electrical Infrastructure Project

Powersystems delivered the HV and LV electrical infrastructure, cabling, containment and commissioning for the 4 MW DRUPS system at the Principality Stadium, providing uninterrupted power for major events. The new system ensures seamless backup supply and enhanced resilience for Wales’ national stadium, safeguarding critical operations during high‑profile sporting and entertainment fixtures.

Plastic Omnium Warrington – 1.0 MW CHP Electrical Infrastructure & 11 kV Substation

Powersystems delivered the 11 kV substation, transformer installation, LV infrastructure and commissioning for the 1.0 MW CHP system at Plastic Omnium Warrington, supporting efficient and reliable on site energy generation.

Plastic Omnium Edison Road – 1.3 MW CHP Electrical Infrastructure Project

Powersystems delivered the LV electrical infrastructure, cable containment, protection systems and commissioning for the 1.3 MW CHP generator at Plastic Omnium Edison Road, supporting efficient onsite low carbon energy generation.

Lower Dunton Flexible Generation 11 kV Substation

Powersystems delivered the 11 kV grid connection and full Electrical Balance of Plant for the 7.5 MW Lower Dunton Flexible Generation site, including HV/LV installation, testing, protection and commissioning to support Conrad Energy’s growing distributed generation portfolio

Joseph Heler Cheese Factory – 1.0 MW CHP Electrical Infrastructure Project

Powersystems delivered the full 11 kV electrical infrastructure, HV cabling, protection systems and G99 commissioning for the 1 MW CHP generator at Joseph Heler Cheese Factory, providing efficient on site low carbon energy generation.