Parc Adfer Energy‑from‑Waste Facility – 20 MW Electrical Infrastructure Project
Powersystems delivered the 33 kV grid connection, 11 kV electrical distribution, transformer systems and full protection and commissioning works for the 20 MW Parc Adfer Energy‑from‑Waste facility in Deeside. This major project supported CNIM and Wheelabrator in delivering a highly efficient energy‑recovery plant, integrating HV/LV systems, turbine feeds and SCADA control. The robust electrical infrastructure now underpins long‑term reliable operation of one of Wales’ flagship waste‑to‑energy facilities.