Farleigh Wallop Anaerobic Digestion Plant — 1.5 MW Grid Connection
Powersystems delivered the full 11 kV grid connection for Tamar Energy’s first AD facility at Farleigh Wallop, installing a 3 km ducted cable route, directional drilling, substation equipment and G59/2 commissioning to enable 1.5 MW renewable generation.