Wind Farm Electrical Contractor – Design & Build (EBoP & Grid Connection)

Power your wind project with the UK’s trusted high‑voltage specialists. As an experienced wind farm electrical contractor, Powersystems delivers complete design and build services: Electrical Balance of Plant (EBoP), substations and switchgear, HV cabling and earthing, SCADA cabling, testing and commissioning, plus Independent Connection Provider (ICP) grid connections.

EBoP substation build for onshore wind farm – transformer lineup
Get Started, Planning Your Wind Farm Project with Powersystems

Building a wind farm is a complex undertaking that requires teams of specialists to handle the many aspects of the project—from conception and planning to implementation.

Speak with one of our High Voltage Electrical Engineering Wind Farm Specialists today

Let Powersystems deliver your wind farm electrical infrastructure with the precision, safety and reliability we are known for.

 


Our Wind Farm Electrical Contractor Services

Electrical Design & Engineering

Electrical Balance of Plant (EBoP)

EBoP ensures a complete, integrated electrical infrastructure from the turbines to the grid interface, engineered and installed by a Powersystems your specialist HV contractor.

Grid Connection (ICP)

Substations & Switchgear

HV Cabling & Earthing

SCADA Cabling & Integration

Testing & Commissioning


Powersystems have connected 35% of UK land-based wind farms, a total of 1,789 wind turbines.



Below are examples of completed and recent wind projects connected by Powersystems



Read the latest wind farm case studies from Powersystems in wind farms projects.

Dorenell Wind Farm Project

Powersystems were appointed as the wind farm Electrical Balance of Plant (EBoP) contractor with responsibility for the design, build, commissioning and energisation of the entire wind farm electrical infrastructure works from the 132 kV connection to the Distribution Network Operator through to the final electrical and fibre optic terminations to the Vestas V90 turbines.

Wind Farm Electrical Contractors Case Study Dorenell Wind Farm
PDF Download

Aikengall II Wind Farm Project

Powersystems were appointed to design, supply install, test and commission a 132 kV grid connection.

Powersystems designed, installed and commissioned one of the first point-on-wave circuit breaker controllers to be used in the UK for controlled energisation of a 132 kV grid transformer to ensure voltage dips were kept within National Grid limits when energising the transformer.

Wind Farm High Voltage Contractors Case Study Aikengall II
PDF Download