Bristol Port, Royal Portbury Dock (RPD) Shiploader

Case study 15999

Name of Client and Location: Bristol Port, Royal Portbury Dock (RPD)
Project Value:  
Duration of the Project: 2021 (5 Months)
Services: Electrical Infrastructure as part of overall refurbishment project
Market Sector: UK Ports
Powersystems Fact: Powersystems celebrate 24 years as the UK’s first Independent Connection Provider.

Bristol Port, RPD Ship Loader

As the preferred electrical infrastructure partner for over 26 years, Powersystems one of the UK’s leading high voltage engineering specialists are delighted to have completed electrical infrastructure works for The Bristol Port Company at the Royal Portbury Dock, Grain Handling Conveyor Plant.

Bristol Port is experienced in the handling of dry bulk cargoes with an ability to handle vessels up to 130,000 dwt through their two dry bulk terminals at Royal Portbury Dock (RPD) and Avonmouth Dock

Royal Portbury Dock

The bulk terminal at RPD handles vessels up to 130,000 dwt discharging animal feeds and loading grain. RPD has the largest sea lock in the UK with dimensions of 42.7m beam x 365.7m length x 14.5m arrival draft.

There are 2 x 300m berths with four discharge units with a discharge rate of 25,000 mt / 24 hrs. In addition there is a grain loader capable of loading panamax sized vessels. Linked to the berth are two animal feed and grain warehouses with a 200,000 mt capacity and grain silos with a capacity of 15,000 mt. 

Avonmouth Dock

At Avonmouth Dock, vessels up to 40,000 dwt can be discharged and loaded. Currently they handle a wide variety of cargoes such as aggregate, animal feed, grain, wood pellets, and minerals.

They Avonmouth Dock team operate cranes from a 100mt Gottwald Harbour Mobile to hydraulic mobile cranes and have invested in over 400,000 sq. ft. of bulk warehousing at Avonmouth Dock in recent years. They also offer added value services such as blending and milling for animal feeds and grains.

Avonmouth Lock has dimensions of 30.5m beam x 266.7m length x 11m arrival draft. Avonmouth Dock is rail connected.

 

Major design considerations:

The ship loader refurbishment was ordered by the Bristol Port following a major fire.

Powersystems were engaged by Alatus as Bristol Ports preferred high voltage electrical engineering partner to deliver the HV 11 kV switchgear, transformers and 3.3 kV motor starter panels installation as part of the overall refurbishment project that Alatus has carried out for Royal Portbury Dock at the Grain Handling Conveyor Plant.

The major items of electrical plant that Powersystems designed, supplied, installed, and commissioned were:

  • To supply, deliver, offload, install, test and cold commission 3.3kv switchboard

  • To supply, deliver, offload, test and cold commission 1no 3.3/415v ANAN cast resin transformer in IP21 rated enclosure

  • To fully commission the above on site, at Bristol Port Company Royal Portbury Docks

  • To carry out 3.3kv termination works at the site

  • To provide design and engineering services, including the provision of as installed drawings upon completion, with all testing and commissioning data

  • To provide the services of a Powersystems UK Senior Authorised Person to carry out acceptance of BPC isolations and safety documents and to issue such documents to Powersystems UK competent persons under our approved safety rules and procedures

Powersystems partnerships:

Powersystems were engaged by Alatus who are crane specialists with expertise in marine, offshore, port and shipyards and construction and industrial sectors. 

Alatus expertise ensures Bristol port and terminal clients maximize their equipment’s operational efficiency. Healthier machines provide financial predictability and mitigate the risk of disruption to the port and terminal operations.

Ship Loaders have a range of specifications with varying designs and functionality. Alatus simplify  supply chain interactions by providing cross-disciplinary technical service and equipment support to keep products moving. 

They do this by delivering ad-hoc ship loader crane services, refurbishments, retrofit and upgrades, and comprehensive maintenance support contracts.

Project timings:

February – July 2021

What the client wanted:

Powersystems delivered the HV 11kV switchgear, transformers and 3.3kV motor starter panels installation as part of the overall refurbishment project that Alatus has carried out for Royal Portburty Dock at the Grain handling Conveyor Plant.

How Powersystems have helped:

Powersystems engineers were involved with the;

  • Switchgear installation and commissioning
  • Transformer installation and commissioning
  • Cable design, supply & installation
  • HV testing
  • SAP provision

To speak with Powersystems, please contact us by...

Phone

01454 318000

Email

enquiries@powersystemsuk.com

Talk

Request a call back

Powersystems UK Delivering Greener Power Solutions

Pin It on Pinterest

Share This

Share this post with your friends!