|
|
|
|
windfarms
Experience in the design and installation of high voltage electrical infrastructure has placed Powersystems in a position ideally suited to carryout wind farm electrical balance of plant contracts. Since our first wind farm installation at Goonhilly downs in 1992 we have been actively involved with wind farm projects ranging from single turbines to 25 turbine sites. Powersystems engineers are experienced in the design, specification installation and commissioning of wind farm switchgear, transformers, cable infrastructure, earth systems, SCADA cabling enabling the complete installation to be carried out. In addition to the on site electrical balance of plant works Powersystems can provide grid connections to wind farm sites and have successfully done so.
|
 |
 |