windfarm experience
Maesgwyn - Construction 2010
- 26MW Connected at 132kV
- 132/33kV substation design and build
- 13 x 2MW Alstom turbines
- Design and construction of site electrical infrastructure
Delabole - Construction 2010
- 10MW Connected at 33kV
- 4 x 2.5MW Enercon turbines
- Design and construction of site electrical infrastructure
Rusholme - Construction 2010
- 24MW Connected at 66kV
- 66/33kV substation design and build
- 12 x 2MW REPower turbines
- Design and construction of site electrical infrastructure
Tullo - construction 2009-2010
- 17.5MW connected at 33kV
- 7 x 2.5MW Nordex turbines
- Design and construction of site electrical infrastructure
- Provision of Dstatcom units to ensure grid compliance
- Provision of 7No wind turbine transformer substations
Wern Ddu - construction 2009-2010
- 9.2MW connected at 33kV
- 4 x 2.3kW Enercon E70 turbines
- Design and construction of site electrical infrastructure
- 33kV grid connection contestable works construction
Pates Hill - 2009
- 14MW Connected at 33kV
- 7 x 2MW Vestas V80 turbines
- Construction of site electrical infrastructure
Craigengelt - 2009
- 17.5MW Connected at 33kV
- 7 x 2.5MW Nordex turbines
- Design and construction of site electrical infrastructure
Solutia - 2009
- 5MW connected at11kV
- 2 x 2.5MW Nordex turbines
- Provision of 2No wind turbine transformer substations
- Intergration with existing site 11kV infrastructure
Crystal Rig 2 - construction 2008-2009-2010 [See Case Study]
- 138MW connected at 33kV
- 60 x 2.3MW Siemens turbines
- Design and construction of site electrical infrastructure
- Provision of 60No wind turbine transformer substations
- Grid code compliance
Windscales Moor - 2009
- 5.95MW connected at 33kV
- 7 x 850MW Vestas V52 turbines
- 33kV grid connection for adoption by United Utilites
- Design and construction of site electrical infrastructure
- Provision of wind turbine transformer substations
Parc Cynog - 2009
- 4.8MW Connected at 33kV
- 6 x 800kW Enercon E48 turbines
- Construction of site electrical infrastructure
Liverpool Docks - 2008
- 12MW Connected at 33kV
- 4 x 3MW Nordex turbines
- Design and construction of site electrical infrastructure
Aikengall - 2008
- 48MW connected at 33kV
- 16 x 3MW Vestas turbines
- Design and construction of site electrical infrastructure
- Provision of Dstatcom units to ensure grid compliance
Carno 2 extension - 2008
- 15.6MW connected at 33kV
- 12 x 1.3MW Siemens turbines
- Design and construction of site electrical infrastructure
Whittlesea & Ramsey - 2008
- 2x2MW Connected at 11kV
- 2 x 2MW Vestas turbines
- Construction of site electrical infrastructure
Mael Maelogan 2 - 2008
- 11.7MW connected at 33kV
- 9 x 1.3MW Siemens turbines
- Design and construction of site electrical infrastructure
Knabs Ridge - 2007
- 16MW connected at 33kV
- 8 x 2MW REPower turbines
- 33kV grid connection construction for adoption by NEDL
Hafoty Ucha phase 3 - 2006
- Addition of 1 x 850kW Vestas turbine to existing windfarm
- 11kV connection to existing infrastructure & turbine transformer
Tir Mostyn & Foel Goch - 2005
- 21.25MW connected at 33kV
- 25 x 850kW Gamesa G52 turbines
- Design and construction of site electrical infrastructure
- 33kV grid connection construction [see case study]
Blaen Bowi - 2004
- 4.9MW connected at 33kV
- 3 x 1.3MW Bonus turbines
- Design and construction of site electrical infrastructure
- 33kV substation construction with WPD (Western Power Distribution)
Swaffam - 2002
- 3 MW connected at 11kV
- 1 x 3MW Enercon turbine
- 11kV connection for adoption by EDF (Electricity Distribution France)
Nympsfield - 1996
- 500kW connected at 11kV
- 1 x 500kW Enercon turbine
- 11kV connection to Central networks substation
- G59 commissioning and site energisation
Caton Moor - 1994
- 3 MW Connected at 11kV
- 10 x 300kW Vestas turbines
- Design and construction of site electrical infrastructure
Haverrig - 1993
- 3MW connected at 11kV
- 5 x 600kW Vestas turbines
- Design and construction of site electrical infrastructure
Goonhilly Downs - 1993
- 5.6 MW connected at 11kV
- 14 x 400kW Vestas turbines
- Design and construction of site electrical infrastructure
|
 |
 |