windfarm experience


Maesgwyn - Construction 2010

  • 26MW Connected at 132kV
  • 132/33kV substation design and build
  • 13 x 2MW Alstom turbines
  • Design and construction of site electrical infrastructure

Delabole - Construction 2010

  • 10MW Connected at 33kV
  • 4 x 2.5MW Enercon turbines
  • Design and construction of site electrical infrastructure

Rusholme - Construction 2010

  • 24MW Connected at 66kV
  • 66/33kV substation design and build
  • 12 x 2MW REPower turbines
  • Design and construction of site electrical infrastructure

Tullo - construction 2009-2010

  • 17.5MW connected at 33kV
  • 7 x 2.5MW Nordex turbines
  • Design and construction of site electrical infrastructure
  • Provision of Dstatcom units to ensure grid compliance
  • Provision of 7No wind turbine transformer substations

Wern Ddu  - construction 2009-2010

  • 9.2MW connected at 33kV
  • 4 x 2.3kW Enercon E70 turbines
  • Design and construction of site electrical infrastructure
  • 33kV grid connection contestable works construction

Pates Hill - 2009

  • 14MW Connected at 33kV
  • 7 x 2MW Vestas V80 turbines
  • Construction of site electrical infrastructure

Craigengelt - 2009

  • 17.5MW Connected at 33kV
  • 7 x 2.5MW Nordex turbines
  • Design and construction of site electrical infrastructure

Solutia - 2009

  • 5MW connected at11kV
  • 2 x 2.5MW Nordex turbines
  • Provision of 2No wind turbine transformer substations
  • Intergration with existing site 11kV infrastructure

Crystal Rig 2 - construction 2008-2009-2010 [See Case Study]

  • 138MW connected at 33kV
  • 60 x 2.3MW Siemens turbines
  • Design and construction of site electrical infrastructure
  • Provision of 60No wind turbine transformer substations
  • Grid code compliance

Windscales Moor - 2009

  • 5.95MW connected at 33kV
  • 7 x 850MW Vestas V52 turbines
  • 33kV grid connection for adoption by United Utilites
  • Design and construction of site electrical infrastructure
  • Provision of wind turbine transformer substations

Parc Cynog - 2009

  • 4.8MW Connected at 33kV
  • 6 x 800kW Enercon E48 turbines
  • Construction of site electrical infrastructure

Liverpool Docks - 2008

  • 12MW Connected at 33kV
  • 4 x 3MW Nordex turbines
  • Design and construction of site electrical infrastructure

Aikengall - 2008

  • 48MW connected at 33kV
  • 16 x 3MW Vestas turbines
  • Design and construction of site electrical infrastructure
  • Provision of Dstatcom units to ensure grid compliance

Carno 2 extension - 2008

  • 15.6MW connected at 33kV
  • 12 x 1.3MW Siemens turbines
  • Design and construction of site electrical infrastructure

Whittlesea & Ramsey - 2008

  • 2x2MW Connected at 11kV
  • 2 x 2MW Vestas turbines
  • Construction of site electrical infrastructure

Mael Maelogan 2 - 2008

  • 11.7MW connected at 33kV
  • 9 x 1.3MW Siemens turbines
  • Design and construction of site electrical infrastructure

Knabs Ridge - 2007

  • 16MW connected at 33kV
  • 8 x 2MW REPower turbines
  • 33kV grid connection construction for adoption by NEDL

Hafoty Ucha phase 3 - 2006

  • Addition of 1 x 850kW Vestas turbine to existing windfarm
  • 11kV connection to existing infrastructure & turbine transformer

Tir Mostyn & Foel Goch - 2005

  • 21.25MW connected at 33kV
  • 25 x 850kW Gamesa G52 turbines
  • Design and construction of site electrical infrastructure
  • 33kV grid connection construction [see case study]

Blaen Bowi - 2004

  • 4.9MW connected at 33kV
  • 3 x 1.3MW Bonus turbines
  • Design and construction of site electrical infrastructure
  • 33kV substation construction with WPD (Western Power Distribution)

Swaffam - 2002

  • 3 MW connected at 11kV
  • 1 x 3MW Enercon turbine
  • 11kV connection for adoption by EDF (Electricity Distribution France)

Nympsfield - 1996

  • 500kW connected at 11kV
  • 1 x 500kW Enercon turbine
  • 11kV connection to Central networks substation
  • G59 commissioning and site energisation

Caton Moor - 1994

  • 3 MW Connected at 11kV
  • 10 x 300kW Vestas turbines
  • Design and construction of site electrical infrastructure

Haverrig - 1993

  • 3MW connected at 11kV
  • 5 x 600kW Vestas turbines
  • Design and construction of site electrical infrastructure

Goonhilly Downs - 1993

  • 5.6 MW connected at 11kV
  • 14 x 400kW Vestas turbines
  • Design and construction of site electrical infrastructure
. .