windfarm experience


Liverpool Docks - Construction in 2008

  • 12MW Connected at 33kV
  • 4 x 3MW Nordex turbines
  • Design and construction of site electrical infrastructure

Aikengall - Construction in 2008

  • 48MW connected at 33kV
  • 16 x 3MW Vestas turbines
  • Design and construction of site electrical infrastructure
  • Provision of Statcom units to ensure grid compliance

Mael Maelogan extension - Construction in 2008

  • 11.7MW connected at 33kV
  • 9 x 1.3MW Siemens turbines
  • Design and construction of site electrical infrastructure

Carno 2 extension - Construction in 2008

  • 15.6MW connected at 33kV
  • 12 x 1.3MW Siemens turbines
  • Design and construction of site electrical infrastructure

Knabs Ridge - 2007

  • 16MW connected at 33kV
  • 8 x 2MW REPower turbines
  • 33kV grid connection construction for adoption by NEDL

Hafoty Ucha phase 3 - 2006

  • Addition of 1 x 850kW Vestas turbine to existing windfarm
  • 11kV connection to existing infrastructure & turbine transformer

Tir Mostyn & Foel Goch - 2005

  • 21.25MW connected at 33kV
  • 25 x 850kW Gamesa G52 turbines
  • Design and construction of site electrical infrastructure
  • 33kV grid connection construction [see case study]

Blaen Bowi - 2004

  • 4.9MW connected at 33kV
  • 3 x 1.3MW Bonus turbines
  • Design and construction of site electrical infrastructure
  • 33kV substation construction with WPD (Western Power Distribution)

Swaffam - 2002

  • 3 MW connected at 11kV
  • 1 x 3MW Enercon turbine
  • 11kV connection for adoption by EDF (Electricity Distribution France)

Nympsfield - 1996

  • 500kW connected at 11kV
  • 1 x 500kW Enercon turbine
  • 11kV connection to Central networks substation
  • G59 commissioning and site energisation

Caton Moor - 1994

  • 3 MW Connected at 11kV
  • 10 x 300kW Vestas turbines
  • Design and construction of site electrical infrastructure

Haverrig - 1993

  • 3MW connected at 11kV
  • 5 x 600kW Vestas turbines
  • Design and construction of site electrical infrastructure

Goonhilly Downs - 1993

  • 5.6 MW connected at 11kV
  • 14 x 400kW Vestas turbines
  • Design and construction of site electrical infrastructure
. .