Brogborough - 2007
- 25MW connected at 33kV
- 25 x 1MW & 1.4MW Jenbacher units
- Turnkey project - £4.7Million
- Design and construction of generation compound
- Design and construction of mechanical infrastructure
- Design and construction of 33/11kV substation
- Design and construction of site electrical infrastructure
Bletchley - 2007
- 3MW connected at 33kV
- 3 x 1MW Jenbacher units
- Turnkey project £1.7Million
- Design and construction of generation compound
- Design and construction of mechanical infrastructure
- Design and construction of 33/11kV substation
- Design and construction of site electrical infrastructure
2MW Sites - 2002 - 2007
Scabba Wood, Levit Hagg, Humberfield, Dorket Head, Milton, Immingham
- 2MW connected at 11kV
- 2 x 1MW Jenbacher units
- Turnkey projects
- Design and construction of generation compound
- Design and construction of mechanical infrastructure
- Design and construction of site electrical infrastructure
Kaimes - 2003
- 4MW connected at 33kV
- 4 x 1MW Caterpillar units
- Turnkey project
- Design and construction of generation compound
- Design and construction of mechanical infrastructure
- Refurbishment of 4x1MW Caterpillar engines
- Design and manufacture of new engine control panels
- Design and construction of site electrical infrastructure
|
 |
 |