Projects

The Bristol Port, Royal Portbury Dock, Ship Loader

Powersystems designed, installed, tested and commissioned the electrical infrastructure for Bristol Port, Royal Portbury Dock Ship Loader project.

Aikengall II Wind Farm

Powersystems designed, installed, tested and commissioned the electrical infrastructure for the 60.8 MW Aikengall II Wind Farm project.

Dorenell Wind Farm

Powersystems designed, installed, tested and commissioned the electrical infrastructure for the 177 MW Dorenell Wind Farm project.

Brecon Power STOR

Powersystems high voltage (HV) power engineering were responsible for the design, installation, testing and commissioning of the electrical infrastructure associated with the construction of the 21 MW embedded short term operating reserve (STOR).

Kernow Solar Park, 5 MW Project

Powersystems were responsible for the design, installation, testing and commissioning of the electrical infrastructure associated with the construction of the 5 MW solar park, Kernow Solar Farm, St Mawgan near to Newquay Cornwall airport.

Farleigh Wallop Anaerobic Digestion plant, 1.5 MW Project

Powersystems connected Farleigh Wallop Anaerobic Digestion facility the first Tamar Energy Anaerobic Digestion project in Basingstoke to the Grid.

Addenbrookes Hospital NHS

Powersystems were employed to design, install and commission a new 33 kV primary substation on the hospitals site.

Crystal Rig II Wind Farm Project

Powersystems designed, installed, tested and commissioned the electrical infrastructure for the 138 MW Crystal Rig II Wind Farm project.

Clocaenog Forest Wind Farm Project

Powersystems designed, installed, tested and commissioned the electrical infrastructure for the 96 MW Clocaenog Wind Farm project.

Fraisthorpe Wind Farm Project

Powersystems designed, installed, tested and commissioned the electrical infrastructure for the 29.7 MW Fraisthorpe Wind Farm project.