33kV connections
Knabbs Ridge Windfarm - 2007
- 16.9MW Generation connection adopted by NEDL
- 33kV Cable & pilot installation
- Design and installation of 33kV substation
- 3 panel 33kV Areva WS switchboard
- Protection panel suite
- Battery charger & Fault recorder
Trecatti Landfill - 2007
- 4MW Generation connection adopted by WPD
- 33kV Cable & pilot installation
- Design and installation of 33kV substation
- 2 panel 33kV Areva WS switchboard
Tir Mostyn windfarm - 2005 [See Case Study]
- 22.5MW Generation connection adopted by SPManweb
- 13km 33kV Cable installation
- 13km Fibre optic pilot installation
- Design and installation of 33kV substation
- 2 panel 33kV Areva WS switchboard
- Protection panel suite
- Battery charger
Addenbrookes NHS Trust - 2003 [See Case study]
- 18MW connection adopted by EDF
- 4km 33kV Cable & pilot installation
- Undertrack Rail track crossing
- Design and Construction of 33kV Primary substation
- 2 x 11/18/24MVA 33/11kV Transformers
- 6 Panel 11kV switchboard
- Protection panel suite
- Customers 11kV switchboard
Bretts Landfill - 2001
- 6MW connection adopted by Seeboard
- 1km 33kV Cable installation
- Design and installation of 33kV substation
- 2 panel 33kV Areva WS switchboard
Rainham Landfill - 2000
- 10MW connection adopted by EDF
- 3km 33kV cable & pilot installation
- Excavation through SSSI
- Undertrack rail crossing
Arpley Landfill - 1998
- 16MW connection adopted by SPManweb
- Design and installation of 33kV substation
- 3panel 33kV Areva WS switchboard
- Protection panel suite
- Battery charger
- Customers 33/11kV transformer & infrastructure
|
 |
 |